This project required some integrated temporary works and clear understanding of the building process. The rear two storey structure in the rear elevation was required to hover above the glass rear extension. We achieved this by using the mass of the main structure and cantilevering two steel beams out to pick it up. By inserting a new raft below the building, we were able to redistribute loads evenly eliminating any differential movement.

Architect Michaelis Boyd Associates Ltd
Contractor J & Z Construction Ltd
Client Private