Previously on the site stood an old snooker hall of which was demolished to make way for a new gym and 31 residential apartments. The new gym will be situated to the Basement with additional commercial on the Ground Floor with the residential properties on the upper 4 floors.
Traditional reinforced construction throughout and the basement formed in contiguous piled wall and load bearing piles.
Architect | HJ Lyons Architects |
---|---|
Contractor | HOC UK LTD |
M&E Engineer | Malachy Walsh + Partners |
Client | IDM Properties |