Tottenham’s new accommodation The Lodge is complete.
The accommodation Lodge building for the players, is within a 2 storey cross laminated timber structure, while the sports facility, a gym, treatment area, dining room, tactics and office for the 1st team players and staff, will be within a 2 storey steel frame structure on a reinforced concrete basement.
The complex project required close collaboration with the design teams as the scheme utilises all traditional structural materials: concrete, timber, steel and masonry, in conjunction with modern building materials such as cross laminated timber and glulam beams.
Lyons O’Neill have been involved since the concept stage of this project, and played a key role with the architects obtaining planning permission, particularly in our role designing an amenable SUDS scheme for the 0.6Ha site and providing remedial schemes for the existing buildings of historic interest.
Architect | F3 Architects |
---|---|
Contractor | Base |
M&E Engineer | XCO2 |
Client | Tottenham Hotspur Football Club |
Value | Not Disclosed |